Image1 Image2 Image3 Image4 Image5 Image6 Image7 Image8 Image9 Image10 Image11 Image12 Image13 Image14 Image15 Image16 Image17 Image18 Image19

Login Form



News

Latest News

 

 

 

 

 

 

 

 

 

 

 

 

 

 

President/CEO addressing staff of ACNL on safety day 2012


ACNL conference room during safety day 2012.


Group photograph on safety day 2012

Installation of cold cutting machine on the defected pipe at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

Cold cutting of defected pipe in progress at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

Installation of spool in progress at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

Welding in progress at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

Back filling in progress at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

Reinstatement of site after completion of sectional replacement at 20inch x 18km KCTL sectional replacement at Ogbogolo Riser for SPDC Nigeria P.O. No. 4510266766

 

Company News

ACNL equipment during mobilization for 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

ACNL equipment during mobilization for 28inch leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

ACNL and SPDC personnel during tool box meeting at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

Construction of cofferdam in progress at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

Constructed cofferdam at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

Work in progress inside the constructed cofferdam at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

Completed 2nos clamped point at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

Retrieval of cofferdam frame work at 28inch TNP leak repair by clamping at Okolo Lunch P.O No. 4510272728

 

ANASAMI LIMITED TRUCKS

ANASAMI LIMITED TRUCKS

ANASAMI LIMITED EQUIPMENT

ANASAMI LIMITED EXCAVATOR

ANASAMI LIMITED CEO/MD (SECOND FROM LEFT) WITH PARTNERS

ANASAMI LIMITED LOW-BED TRUCKS

ANASAMI LIMITED SELF-LOADER AND VACUUM TRUCKS

INSERTION OF GASKET DURING VALVE INSTALLATION AT AGBADA II FLOW STATION FOR SPDC NIGERIA. PO NUMBER: 4510230429, SE NUMBER 10001040990

LEAK REPAIR BY CLAMPING OF 24'' TRANS-NIGER-PIPELINE AT BIARA FOR  SPDC NIGERIA. PO NUMBER: 4510228810, SE NUMBER 1000102009

GAS LINE UPGRADE BY INSTALLATION OF PIG LOADING TRAY ON EASTERN GAS LINE AT CARTHONE CHANNEL FIELD FOR SPDC NIGERIA. PO NUMBER: 4510198647, SE NUMBER: 1000912963

SWAMP BUGGY STRINGING 24" PIPES DURING SECTIONAL REPLACEMENT FOR THE 24" TRUCK LINE @             KALIBIAMA FOR SHELL PET. DEV. COMPANY NIGERIA. PURCHASE ORDER (PO) NUMBER 4510208821,                      4510208822, 4510208823

ANASAMI CONSTR. NIG. LTD EQUIPMENTS

ANASAMI LTD. SWAMP BUGGIES EXCAVATING DURING DEFECT POINT REPAIR ON 16" EGBEMA-ASSA TL FOR SHELL PET. DEV. COMPANY NIGERIA. PURCHASE ORDER (PO) NUMBER 4510221931

FOAMING THE 36" BARREL DURING HOT WORK JOB @ NKPOKU MANIFOLD FOR SHELL PET. DEV. COMPANY NIGERIA. PURCHASE ORDER(PO) NUMBER 4510207220.


ANASAMI LTD WELDING MACHINES @ THE FABRICATION YARD

ANASAMI PERSONNEL GROUP PICTURE AFTER 2011 SAFETY DAY TRAINING @ ANASAMI LTD FABRICATION YARD